Skip to content

PDF Setup Guides

We are committed to making the set up of our standard products as seamless as possible. If you need additional help with setting up your TMC product please contact us at tmc.service@ametek.com | +1 978 532-6330 | 800-542-9725 (Toll Free).
  • PDF Setup Guides +


    Click the links below to view the setup guides in PDF.


    pdf download icon CleanTop Optical Tops & Breadboards Setup

    The following procedure provides suggested steps to unload an optical table top from a delivery truck, unpack, and move to area for setup. Since optical tops and breadboards can be heavy, three people are typically required for this type of installation. 

    pdf download icon Optical Top Support System Setup

    The following procedure provides suggested steps to set up an optical top support system using mounted vibration isolators and rigid leveling stands. This guide explains how to assemble your modular posts into 4 or 6 post sets or as free standing posts with oversize baseplates. 

    pdf download icon CleanTop Joined Tables Setup

    The following procedure provides suggested steps to join optical tops in L or T shape configurations. These optical tops can also be configured with two working heights by coupling tables with different thickness.

    pdf download icon CleanBench and Accessories Setup

    The following procedure provides suggested steps to set up the vibration isolation lab table, its piston air isolators, and additional accessories. The isolators require a continuous supply of compressed air or nitrogen to operate properly.

    pdf download icon CleanBench Part Identification Reference Guide

    This guide illustrates and identifies the components of the vibration isolation lab table, including the set up of the table's legs, valves, and tubing.

    pdf download icon CleanBench Aktiv Vibration Isolation Table User Guide

    This guide provides instructions on how to operate and assemble this two-stage vibration isolation table that utilizes active and passive vibration cancellation.  

    pdf download icon CleanBench TableTop CSP Setup

    The following procedure provides suggested steps to set up the passive benchtop isolator. The isolator requires a continuous supply of compressed air or nitrogen to operate properly. 

    pdf download icon Everstill K-400 Setup

    The following procedure provides suggested steps to set up the benchtop active vibration cancellation platform, as well as the recommended ventilation and operating temperature.

    pdf download icon Faraday Cage Setup 

    The following procedure provides suggested steps to set up the electric and magnetic field cancellation cage to support a compact vibration isolation system. 

    pdf download icon Air Leak Troubleshooting Guide 

    This guide provides instructions on how to fix an isolation system from air leakage.